The outcome is linked to all five Results Areas in the national electricity results framework and the key performance indicators for the RBL program outcome are identical or similar to those used by PLN in their own Results Areas (increase in number of customers, electricity sales, and customer satisfaction). This adequacy and reliability is defined by the outcome indicators, which are measured against realistically set targets. The expected outcome of the RBL program is that the adequacy and reliability of power supply are achieved for Sumatra. At the impact level, the program is aligned with the RUPTL's goal of enhancing the quality of life in Indonesian society by the sustainable use of electricity as a key driver of increased economic activity. A stronger transmission system with robust distribution networks will increase reliability of connections with industrial, commercial, and residential customers. The program will contribute to PLN's overarching power development plans for Sumatra as identified in the RUPTL 2015 2024. The government is now calling for expanding power generation capacity across Indonesia by an additional 35 gigawatts (GW) from 2015 to 2019 to achieve 7% economic growth and alleviate existing grid constraints of which 9 GW is to be installed in Sumatra. Within the sector, the Electricity Power Supply Business Plan (Rencana Usaha Penyediaan Tenaga Listrik or RUPTL) provides a ten-year plan (2015 2024) which also includes a five-year Electricity Development Plan with specific targets for 2015 2019. One of the priorities in the Government of Indonesia's National Medium-Term Development Plan (Rencana Pembangunan Jangka Menengah Nasional or RPJMN), 2015 2019 is to enhance domestic energy security. Loan 8297-INO: Electricity Grid Strengthening Sumatra ProgramĮlectricity transmission and distribution Loan 3339-INO: Electricity Grid Strengthening Sumatra Program Electricity Grid Strengthening-Sumatra Program